Newsroom
The pouring methods of steel casting
2015-11-30 | Editor:

  Great Wall Steel Casting Company installs new casting shakeout system over the year of 2006.

  Designed to allow Southwest Steel to more efficiently use existing floor space, the new shakeout system also improves employee safety and ergonomic issues.

  By rotating the pouring lines 90 degrees, 25 percent additional space was added to the pouring/shakeout floor for mold pouring lines. This allows for greater flexibility in production scheduling which must balance the workload of the molding, furnace and core making departments.

  The main shakeout conveyor was placed in a pit that runs the entire width of the pouring bay. This allows each pouring line to be discharged directly into the main shakeout conveyor.

  Previously, all molds had to be pushed down each pour off line and then by transfer car to one location for dumping into the shakeout. This new design allows for both greater productively and also reduces employee fatigue.

  Also incorporated into the redesigned shakeout system was additional dust collection capacity and a mechanized device for casting removal from the the shakeout conveyor.

  As castings coming from the pouring floor can weigh as much as 1,500 lbs. and have a temperature of 1,000 degrees F., it was important to reduce both the physical labor and exposure to hot steel castings and dust of personnel working at this location.

Order online
Fill out your message and submit it . Options with * must be filled in.

Prev:Great Wall Steel casting Company can provide wear and heat-resistant parts for cement plant

Next:How does Great Wall Steel Casting Company achieve the change "Chinese standard" to "International standards"?

CONTACT
  • Tel: +8615290747879
  • Whatsapp: +8615290747879
  • E-mail: casting@chaeng.co
  • Skype : GreatWall1958
casting@chaeng.co +8615290747879