Cement mill is the key equipment of the whole cement making production line project, for this reason, in the whole technical process, it is indispensable. In the installation process, it can be never too careful to use scientific construction method and advanced technology test means and strictly control the quality of every installation procedure to ensure long time of stable, excellent and highly efficient operation of this machine.
Cement mill spare parts detailed installation methods are complicated, which mainly include the following:
1. Foundation acceptance. Make preparations for the installation of the equipment and carefully check the foundation, which is the first and most basic procedure.
2. Pre-bury the target and basically rule. Well measuring the size for the assembly of cement mill is also one of the preparation processes.
3. Check the equipment that leaves the stock. Besides the usual inspection, pay attention to check the contact condition of the slide shoe bearing bush and the slide ring of the grinding cylinder.
4. Install the slide shoe bearing. First install the pedestal and screw down the foundation bolts.
5. Final assembly and debugging. After installing the slide shoe bearing, assembly the hollow shaft, and then carry out debugging on the equipment before powder grinding.